Trinity Chapel Complex

New York City, United States of America (the)

The Trinity Chapel Complex is a Manhattan church complex built by Trinity Church as an uptown chapel for Episcopalian parishioners. Richard Upjohn designed its main church in the English Gothic Revival style, and construction ran from 1850 to 1855. The complex grew with a school in 1860, designed by Jacob Wrey Mould, and a Clergy House in 1866. In 1865, an Orthodox Liturgy was held in Trinity Episcopal Church for the first time in American history. The south-facing church façade has four stone buttresses, side turrets and a rose window above the entrance.

Edith Wharton married in the church in 1885, while Frederick Clarke Withers redesigned its reredos and altar in 1892. As affluent residents moved uptown and the neighborhood declined, the congregation dwindled. A Serbian Orthodox congregation purchased the building in 1942 and reopened it in 1944 as a cathedral dedicated to Saint Sava, patron saint of the Serbs.

The cathedral’s sanctuary changed gradually after the transfer. In 1962, a hand-carved oak iconostasis from the Monastery of St. Naum in Ohrid was installed, with icons painted by Russian iconographer Ivan Meljinkov. On September 4, 1966, a bomb exploded near the church and destroyed some stained glass. Replacement windows were commissioned in Byzantine style.

The chapel became a New York City landmark in 1968, and the complex joined the National Register of Historic Places in 1982. Serbian Orthodox Patriarch Pavle visited in October 1992, the first patriarch to visit the New York church community. Peter II, the last king of Yugoslavia, also attended services at the cathedral.

A four-alarm fire began on May 1, 2016, Orthodox Easter Sunday, and destroyed most of the church. Fire marshals determined that incompletely extinguished candles caused it; a caretaker had said candles were stored in a cardboard box beneath wooden furniture in a rear corner. More than 170 firefighters responded, and one person suffered a minor injury.

The stone walls remained standing and were considered structurally sound, though the city ordered metal beams and waterproof canvas to protect them. That work was completed in September 2016. The new nave roof was completed in July 2019, and by November, steel beams for the floor and framing for windows were being installed.

On February 7, 2023, the first Divine Liturgy since the fire was held inside the partially rebuilt cathedral. Its former school serves as the Parish House, while the Clergy House remains part of the complex. Busts outside commemorate Bishop Nikolai Velimirovich, Nikola Tesla and Michael Pupin.

Listen to this audio guide in the app

The website shows the text and photos. The audio guide, map and nearby places are in the free Hotspot app.

Download free on Google Play
QR code to download the app on Google Play
Stories are generated with modern AI models and grounded in facts from Wikipedia (CC BY-SA). AI can make mistakes, so please double-check important details.