Budapest Ferenc Liszt International Airport
Budapest, Hungary

Budapest Ferenc Liszt International Airport was proposed in 1938 after problems at Budaörs Airport. Its site was selected near Pestszentlőrinc, Rákoshegy, and Vecsés, and the name Ferihegy came from the surrounding area associated with landowner Ferenc Mayerffy. The airport was planned for civil, military, and sports use. Construction began in 1942, after Károly Dávid Jr.’s passenger terminal design was selected. Seen from above, the building was intended to resemble an aircraft, with its main hall forming the fuselage and two control towers serving as engines.
World War II caused severe damage, and German and Soviet troops were temporarily stationed at the airport. In 1947, reconstruction for civil aviation was approved. Damaged buildings were repaired or rebuilt, and concrete work on the runway began in 1948.
Meteorological observations at the proposed site had begun in 1939 under Alfréd Hille. The airport was ceremonially inaugurated on 7 May 1950, enabling Maszovlet to operate there. Its early international routes served Prague, Bucharest, Warsaw, and Sofia, with scheduled flights initially connecting mainly to Eastern Bloc countries.
Malév began the first scheduled westbound service, to Vienna, in summer 1956. KLM became the first Western airline to serve Budapest in 1957. By the end of 1958, the runway had been extended to 3,010 metres, and the passenger building was completed around this period.
In 1960, a transit hall, approach lighting, radar equipment, and an extended runway were completed. Later improvements added space to the apron and passenger building, an arrivals hall, and an electromechanical passenger information system. The control tower, designed by Iván Nieder, was later extended by two floors.
A major development programme brought a second runway, taxiways, a control tower, and a technical base for Malév aircraft. The second runway entered service in 1983, and Terminal 2 opened to passengers in 1985. Terminal 2B was inaugurated in 1998 as passenger demand outgrew the existing terminals.
The General Aviation Terminal opened in 1991 for small and private aircraft on domestic and international operations. In spring 1999, American KC-135 aerial refuelling aircraft supporting NATO air strikes in Serbia were stationed at Terminal 1. The airport also has passenger, cargo, and general aviation facilities.
The state privatized the right to operate the airport in 2005, granting it to BAA International for 75 years. That year, Terminal 1 reopened after renovation that renewed its mechanical and electrical systems and utility connections while observing heritage-protection requirements. In 2007, Hochtief acquired the airport company’s British-held ownership share.
A new passenger building, the SkyCourt, opened between Terminals 2A and 2B in 2011. Designed by Zoltán Tima and KÖZTI, it connects the two terminal halls and has a shell-shaped form made with concrete, glass, and steel. Its five floors include two underground levels closed to passengers.
The airport was renamed on 25 March 2011 in honor of composer Ferenc Liszt, on the 200th anniversary of his birth. A 2006 proposal had suggested the name of composer Béla Bartók, but the Committee on Geographical Names did not support it. The renaming prompted controversy, and the committee recommended retaining a name that included Budapest and Ferihegy.
Malév ceased operations and went bankrupt in February 2012. Passenger traffic declined, and Terminal 1 closed to commercial passengers on 30 May. On 1 October, it began operating as the Terminal 1 Airport Event Center. Growth later resumed with the expansion of low-cost airlines, and passenger numbers set records from 2014 to 2016.
The airport introduced a voluntary noise-protection programme, designating a zone where homes could receive thermal and acoustic insulation and ventilation equipment at the operator’s expense. In 2018, a three-level passenger pier opened at Terminal 2B, with departures upstairs, arrivals on the middle level, and service rooms and parking below. Its length is 220 metres.
Passenger services practically stopped from 27 March to 11 April 2020 because of COVID-19 aviation restrictions. The airport company’s shareholders listed in 2021 were AviAlliance, Malton Investment, and Caisse de dépôt et placement du Québec. On 6 June 2024, the Hungarian state repurchased the airport for 3.1 billion euros.
The airport occupies 1,515 hectares and serves international passenger and cargo traffic. Its facilities include Terminals 1, 2A, and 2B, the General Aviation Terminal, and the SkyCourt. In 2024, it handled 17,526,000 passengers; the reported cargo total for 2023 was 201,000 tonnes.
Terminal 1 is described as a Hungarian and European example of architectural modernism. Its renovation received an Építőipari Nívódíj and a 2007 Europa Nostra medal. The airport has also received Jumbos, Galaxy aircraft, Antonov aircraft, and Concordes, and has served as an arrival point for public figures, presidents, and heads of state.
Listen to this audio guide in the app
The website shows the text and photos. The audio guide, map and nearby places are in the free Hotspot app.
Download free on Google Play