Ronacher
Vienna, Austria

Ronacher is a theater in Vienna, built from 1871 to 1872 as the Wiener Stadttheater. Architects Ferdinand Fellner the Elder and Ferdinand Fellner the Younger designed it for a private company founded by journalist Max Friedländer and theater author Heinrich Laube. The founders intended a bourgeois theater that could compete with imperial court theaters without censorship. It opened on 15 September 1872 with Schiller’s Demetrius, adapted by Laube. On 16 May 1884, a fire destroyed the building. Contemporary fire regulations barred rebuilding it as a playhouse because it did not stand free on all four sides.
Anton Ronacher bought the ruins in 1886 and commissioned a concert and ballroom venue from Fellner the Younger. Built from 1887 to 1888, it included a large ballroom, hotel, promenades and winter garden, with electric lighting. Tables and chairs let audiences eat, drink and smoke during performances. Wall paintings by Eduard Veith decorated the building, and its main staircase had Kaisersteinbruch stone steps.
Economic difficulties eventually forced Ronacher to give up the venue. From 1890, variety performers appeared more often, attracting a suburban audience while driving away the aristocracy. Repeated alterations followed, including work in 1901 and 1906 and further changes from 1907 to 1916. Gabor Steiner directed the theater from 1909 to 1912.
From 1928, RAVAG rented parts of the building and broadcast music programs from its studios. In 1938, the theater passed from co-owner Samuel Schöngut to Bernhard Labriola through Aryanization. Schöngut was deported to the Litzmannstadt Ghetto in 1941, then to Auschwitz in 1944, where he was murdered.
After the Second World War, Ronacher served as an alternate venue for the bomb-damaged Burgtheater until 1955. Variety performances returned, and Austrian television began productions there in 1960. After ten years without performances, an operetta returned in 1986. Vereinigte Bühnen Wien bought the building in 1987 and presented Cats and two operas.
A 1987 competition selected Coop Himmelblau’s proposal for an additional storey, but public criticism led to its abandonment in 1991. A later storey, designed by Günther Domenig, was built despite political and cityscape-preservation concerns. Conversion into a musical theater cost 46.9 million euros. By mid-2008, stage technology had been modernized and the stage floor lowered by two metres.
Ronacher now functions as a musical theater operated by Vereinigte Bühnen Wien and wholly owned by the City of Vienna through Wien Holding. It has about 1,000 seats and 40 standing places, though capacity varies by production. The theater has also hosted the Nestroy Theater Prize ceremonies in 2003, 2004 and 2008.
Listen to this audio guide in the app
The website shows the text and photos. The audio guide, map and nearby places are in the free Hotspot app.
Download free on Google Play